K-Electric Net Metering (Green Meter) Service

We manage your full K-Electric green meter application from start to finish.

How It Works & What You Get

Net metering allows you to sell extra solar units back to K-Electric so your bill drops to zero or turns into credit. Doing the K-Electric paperwork, single-line diagrams, and NEPRA approvals on your own can be confusing. Volton Solar handles the whole process for you from day one until the green meter is installed.

✓Complete handling of NEPRA license and K-Electric application.
✓Certified single-line diagrams (SLD) prepared by professional engineers.
✓Support for sanctioned load increase if required.
✓Our engineer is present during the K-Electric inspection and meter installation.
Hardware Details

What Is Included in This Setup

01

Certified Electrical Diagrams

Official drawings and documentation approved for K-Electric submission.

02

Inverter Approval Documents

Laboratory test certificates proving your inverter is safe for the grid.

03

Green Bidirectional Meter

Official K-Electric meter that tracks exported solar units.

04

Final Billing Agreement

Commercial net-metering contract signed with K-Electric.

Step by Step

How We Install It (4 Easy Steps)

01

Bill Feasibility

We verify your K-Electric bill, connection phase, and sanctioned load.

02

File Submission

We submit the complete application file to your local K-Electric IBC center.

03

KE Site Inspection

K-Electric visits your roof with our engineer to verify safety standards.

04

Green Meter Installed

K-Electric installs the bidirectional green meter, and your savings start.

FAQs

Questions People Ask in Karachi

How long does K-Electric net metering take in Karachi?

With Volton Solar managing the application, the process usually takes 45 to 60 days from file submission to green meter installation.

Can I get net metering on a single-phase connection?

K-Electric requires a three-phase connection for net metering. If your home has a single-phase connection, we will help you convert it to three-phase.